CE & COMPLIANCE

CE marking documentation preparation for machinery

Does your machine or equipment require CE marking, but the necessary documentation is missing, incomplete or needs to be organised before delivery? CE Point helps prepare a documentation package that reflects the actual machine and its technical solution.

You do not need to know exactly which document is missing before contacting us. We start by reviewing the machine and the information already available, define the scope of work, and prepare or organise the agreed documentation.

CE marking must be supported by technical documentation, risk assessment, a technical file and the necessary inspections or tests applicable to the specific machine. Our role is to help the manufacturer bring these materials together systematically and align the documentation with the machine’s construction, safety measures and completed checks.

A clear process from start to finish

01

Review of existing information

02

Requirements and gap assessment

03

Checks and action plan

04

Preparation of CE documentation

SERVICE SCOPE

CE documentation tailored to your machine

CE Point helps companies prepare and organise CE marking documentation for machinery and equipment, from an audit of existing materials to the technical file, instructions, inspection records and preparation of an EU Declaration of Conformity draft.

01

CE documentation audit

We review machine information, drawings, diagrams, instructions and other available material. We identify gaps and determine which CE marking documentation needs to be prepared or updated.

02

Risk assessment

We help identify hazards related to the machine, existing protective measures and risks that need to be documented so that the assessment reflects the machine’s actual construction and intended use.

03

Technical file

We help prepare and structure the machine’s technical documentation so that the information required for the project is organised, understandable and easy to locate.

04

Inspection and test records

We prepare inspection sheets and test records based on the actual machine so that relevant checks and results can be documented consistently.

05

Operating and safety instructions

We prepare or organise instructions describing the machine’s operation, adjustment, maintenance and safe use in accordance with its actual design and intended application.

06

EU Declaration of Conformity draft

Once the required assessment steps and supporting evidence are in place, we can prepare a draft EU Declaration of Conformity for the manufacturer to review and sign.

07

CE nameplate and serial production

We help define the required nameplate information, serial-number management, final inspection records and practical principles for maintaining CE documentation in serial production.

HOW IT WORKS

How CE Point prepares the documentation

01

You send machine information or files

Drawings, electrical and pneumatic diagrams, instructions, technical data, photographs and any existing inspection or test records.

02

We review the available information

We determine what is already available, what needs to be completed and which additional checks or evidence may be required.

03

We agree the scope of work

We define which documents, checks and updates will be prepared or organised as part of the project.

04

We inspect the machine if required

Where necessary, we review safety measures, hazard areas and whether the actual machine corresponds to the available documentation.

05

We prepare the CE documentation

We organise the agreed documents into a clear documentation package and identify any additional actions that may still be required.

06

The manufacturer reviews and approves

The manufacturer remains responsible for the final conformity of the machine and signs the EU Declaration of Conformity where applicable.

You do not need to have everything ready. We start with what you already have and determine the next steps together.

STARTING INFORMATION

What information is useful to get started?

Do not postpone your enquiry if some of these documents are not yet available.

  • general and assembly drawings
  • electrical diagrams
  • pneumatic diagrams
  • technical component information
  • operating instructions
  • photographs of the machine
  • machine model and serial number
  • power-supply and rating information
  • existing inspection or test records
  • previous CE documentation

If some information is missing, you do not need to identify it yourself before contacting us. We determine during the project what source information is required.

WHO IS IT FOR?

Who is this service for?

  • small manufacturers
  • machine builders
  • metalworking companies
  • automation companies
  • production-line manufacturers
  • conveyor and special-equipment manufacturers
  • custom and small-series machine manufacturers

PRICING

Pricing

CE documentation audit

from €190

Review of existing CE documentation and identification of documentation gaps.

On-site machine review

from €390 + travel

Practical review of the machine and relevant safety functions.

Complete CE documentation project

from €1,190

A broader CE documentation project covering the process and organisation of the final documentation package.

Large documentation packages, complex automated production lines and special projects are priced separately after reviewing the available information.

Important: CE Point does not issue CE certificates or provide official approval. We do not replace a notified body, testing laboratory or other specialist where specific independent competence is required. We support manufacturers in preparing conformity-assessment documentation, structuring risk assessments and inspections, and organising the necessary documents. If a project requires independent laboratory testing, measurements or third-party assessment, we identify that requirement separately.

FAQ

Frequently asked questions

Is a certificate always required for CE marking?

No. For many machines, the manufacturer carries out the applicable conformity-assessment procedure. The exact procedure depends on the machine and the requirements that apply to it.

Can you help with a machine that has already been built?

Yes. For an existing machine, we start by comparing the actual machine with the documentation already available and then identify the necessary additions and next steps.

What if I do not have a risk assessment or technical file?

That does not prevent us from starting. CE Point can review the machine information and determine which documents can be prepared or organised as part of the project.

Can you inspect the machine on site?

Yes, where the complexity of the machine or the required checks make an on-site review appropriate.

Who signs the EU Declaration of Conformity?

The declaration is issued and signed by the manufacturer or a person authorised by the manufacturer to do so.

NEXT STEP

Need CE documentation for your machine?

Send us the machine information or the files you already have. CE Point will review the project and provide a specific proposal for preparing or organising the required CE marking documentation.